Power

  1. Home
  2. Project
  3. Power
Project

DESIGN, SUPPLY, INSTALL & COMMISSION TWO (2) HIGH PERFORMANCE TAPROGGE DF FOR PDI CONDENSER INLET

Project

DESIGN, SUPPLY, INSTALL & COMMISSION FOUR (4) HIGH PERFORMANCE TAPROGGE DF FOR UNIT 1 CONDENSER INLET

Project

DESIGN SUPPLY, INSTALL & COMMISSION FOUR (4) HIGH PERFORMANCE TAPROGGE DF FOR ACW SYSTEM UNIT 2 & 3

Project

SUPPLY & DELIVERY OF 84" KSB MAMMOUTH BFV

Project

SUPPLY & DELIVERY OF COMPLETE VALVES TO TURBINE MAINTENANCE SECTION

Project

STEEL STRUCTURES BLASTING/COATING & PAINTING

Project

KENYIR DRAFT TUBE GATE GANTRY CRANE COATING

Project

KENYIR INTAKE GANTRY CRANE COATING

Project Description

PROJECT PROFILE

PROJECT :

Design, Supply, Install & Commission Two (2) High Performance Taprogge DF for PDI Condenser Inlet

INDUSTRY :

Power

USE :

Condenser Cooling Water Inlet

CLIENT :

TNB REMACO / Port Dickson Power Station

 

LOCATION :

Port Dickson, Negeri Sembilan

SYSTEM :

TAPPROGGE Debris Filtration System

STATUS :

Installed & commissioned - December 2014

DESCRIPTION :

This is the replacement of existing filters which are failed to deliver its duty to protect the condenser tubes and filtering the CW intake. As requested by PDPS and with referring to our installation base in Janamanjung, we will provide the Operating Panel at the CCR to monitor and control remotely without integrating with the DCS.

 

 

 

 

 

Project Description

PROJECT PROFILE

PROJECT :

Design, Supply, Install & Commission Four (4) High Performance Taprogge DF for Unit 1 Condenser Inlet

INDUSTRY :

Power

USE :

Condenser Inlet Filtration Systems

CLIENT :

TNB Janamanjung Sdn Bhd

LOCATION :

Manjung, Perak

SYSTEM :

TAPPROGGE Debris Filtration System

STATUS :

Completed October 2011

 

Project Description

PROJECT PROFILE

PROJECT :

DESIGN SUPPLY, INSTALL & COMMISSION FOUR (4) HIGH PERFORMANCE TAPROGGE DF FOR ACW SYSTEM UNIT 2 & 3

INDUSTRY :

Power

USE :

ACW Intake Filtration Systems

CLIENT :

TNB Janamanjung Sdn Bhd

LOCATION :

Manjung, Perak

SYSTEM :

TAPPROGGE Debris Filtration System

STATUS :

On-going

DESCRIPTION :

This is the repeat order from TNB JANAMANJUNG due to excellent and proven performance of recently installed TAPROGGE DF (4 x 1800mm at Condense Inlet & 2 x 800mm at ACW System)

 

Project Description

PROJECT PROFILE

PROJECT :

SUPPLY & DELIVERY OF 84" KSB MAMMOUTH BFV

INDUSTRY :

Power

USE :

Isolation Valve

CLIENT :

TNB Port Dickson

LOCATION :

Port Dickson, Negeri Sembilan

SYSTEM :

Condenser Make-up Butterfly Valve

STATUS :

Completed - February 2009

 

Project Description

PROJECT PROFILE

PROJECT :

SUPPLY & DELIVERY OF COMPLETE VALVES TO TURBINE MAINTENANCE SECTION

INDUSTRY :

Power

USE :

Turbine

CLIENT :

TNB Janamanjung

LOCATION :

Manjung, Perak

SYSTEM :

Valve - Turbine By-pass

STATUS :

Completed - March 2014

 

 

Project Description

PROJECT PROFILE

PROJECT :

Steel Structures Blasting/Coating & Painting

INDUSTRY :

Power

USE :

GF 2 Turbine & Boiler Hall - Corrosion Protection

CLIENT :

Kapar Energy Ventures (KEV)

LOCATION :

Klang, MALAYSIA

SYSTEM :

Nukote EP Prime II & Nukote ST

COATED AREA :

1100 m2

COMPLETION :

February 2010

DESCRIPTION :

The plant has facing a problem with the corrosion at their Boiler and Turbine structures due the exposure to saltwater and abrasive ash. We have blasted the steel structures, primed and coated with polyurea up to 2 meter high.

 

Project Description

PROJECT PROFILE

PROJECT :

Kenyir Draft Tube Gate Gantry Crane Coating

INDUSTRY :

Power

USE :

Crane Structure Protection

CLIENT :

Stesen Janaelektrik Sultan Mahmud, Kenyir

LOCATION :

Terengganu, Malaysia

SYSTEM :

Nukote Polyurea ST

COATED AREA :

300 m2

COMPLETION :

July 2009

DESCRIPTION :

Stesen Janaelektrik Sultan Mahmud, Kenyir is facing a problem with their Gate Gantry Crane which corroded and rusted. The existing protection paint used started pilling off and causing a problem to the structure.

 

 

Project Description

PROJECT PROFILE

PROJECT :

Kenyir Intake Gantry Crane Coating

INDUSTRY :

Power

USE :

Crane Structure Protection

CLIENT :

Stesen Janaelektrik Sultan Mahmud, Kenyir

LOCATION :

Terengganu, Malaysia

SYSTEM :

Nukote Polyurea ST

COATED AREA :

450 m2

COMPLETION :

May 2010

DESCRIPTION :

Stesen Janaelektrik Sultan Mahmud, Kenyir is facing a problem with their Gate Gantry Crane which corroded and rusted. The existing protection paint used started pilling off and causing a problem to the structure.

 

ABOUT OUR COMPANY

Logo

Social Media

  • Facebook
  • Twitter

Quick links

  • Home
  • About Us
  • Safety & Health Policy
  • Licenses
  • Products
  • Services
  • Projects
  • Gallery
  • Corporate Social Responsibility
  • Contact Us

CONTACT US

Have questions, comments or just want to say hello:

  • info@gemasb.com
  • +603 7875 7198 / +603 2297 5354
  • Suite D109, Block D, Kelana Square, Jalan SS 7/26, Kelana Jaya, 47301 Petaling Jaya, Selangor Darul Ehsan, Malaysia

Copyright © All rights reserved | Developed by Exitando