Gallery

  1. Home
  2. Gallery
Gallery
Gallery
Gallery

PROJECT :

Steel Structures Blasting/Coating & Painting

INDUSTRY :

Power

USE :

GF 2 Turbine & Boiler Hall - Corrosion Protection

CLIENT :

Kapar Energy Ventures (KEV)

LOCATION :

Klang, MALAYSIA

SYSTEM :

Nukote EP Prime II & Nukote ST

COATED AREA :

1100 m2

COMPLETION :

February 2010

DESCRIPTION :

The plant has facing a problem with the corrosion at their Boiler and Turbine structures due the exposure to saltwater and abrasive ash. We have blasted the steel structures, primed and coated with polyurea up to 2 meter high.

Gallery
Gallery
Gallery

PROJECT :

Kenyir Draft Tube Gate Gantry Crane Coating

INDUSTRY :

Power

USE :

Crane Structure Protection

CLIENT :

Stesen Janaelektrik Sultan Mahmud, Kenyir

LOCATION :

Terengganu, Malaysia

SYSTEM :

Nukote Polyurea ST

COATED AREA :

300 m2

COMPLETION :

July 2009

DESCRIPTION :

Stesen Janaelektrik Sultan Mahmud, Kenyir is facing a problem with their Gate Gantry Crane which corroded and rusted. The existing protection paint used started pilling off and causing a problem to the structure.

Gallery
Gallery
Gallery

PROJECT :

Kenyir Intake Gantry Crane Coating

INDUSTRY :

Power

USE :

Crane Structure Protection

CLIENT :

Stesen Janaelektrik Sultan Mahmud, Kenyir

LOCATION :

Terengganu, Malaysia

SYSTEM :

Nukote Polyurea ST

COATED AREA :

450 m2

COMPLETION :

May 2010

DESCRIPTION :

Stesen Janaelektrik Sultan Mahmud, Kenyir is facing a problem with their Gate Gantry Crane which corroded and rusted. The existing protection paint used started pilling off and causing a problem to the structure.

Gallery

PROJECT :

Topside Major Maintenance Internal Vessel

INDUSTRY :

Oil and Gas

USE :

Primary Containment/Anti Abrasion

CLIENT :

Petronas Carigali Sdn Bhd

LOCATION :

Offshore Oil Platform Peninsular Malaysia

SYSTEM :

Nukote Polyurea ST

COATED AREA :

440 m2

COMPLETION :

June 2007

DESCRIPTION :

Petronas Carigali needed to recoat their internal vessels but the shutdown time was only for a few days. This meant that an epoxy based coating was out of the question due to the long drying time needed. The decision was made to use Nukote Polyurea ST due to its fast curing time and superior physical qualities. The absence of VOCs was also a factor due to the nature of the project which involved working in confined space.

ABOUT OUR COMPANY

Logo

Social Media

  • Facebook
  • Twitter

Quick links

  • Home
  • About Us
  • Safety & Health Policy
  • Licenses
  • Products
  • Services
  • Projects
  • Gallery
  • Corporate Social Responsibility
  • Contact Us

CONTACT US

Have questions, comments or just want to say hello:

  • info@gemasb.com
  • +603 7875 7198 / +603 2297 5354
  • Suite D109, Block D, Kelana Square, Jalan SS 7/26, Kelana Jaya, 47301 Petaling Jaya, Selangor Darul Ehsan, Malaysia

Copyright © All rights reserved | Developed by Exitando